September 2022 is a particular month for Elbląg. It is here, during one week, that two critical events for the entire region took place. A shipping channel was opened on the Vistula spit, and the construction of the Porta Mare complex was officially inaugurated, the general contractor will be the F.B.I. TASBUD.

The Porta Mare complex will be the business center of Elbląg

The Porta Mare complex is the first A-class office building to be located on Wyspa Spichrzów in Elbląg. The investment is carried out under the Factory Program, which is an element of Poland’s sustainable development strategy. Moreover, its task is to shorten the development distance between the largest metropolises and medium-sized cities. The new investment located in Elbląg is to attract tenants not only with its excellent location but also with high-standard amenities.

F.B.I. TASBUD S.A. General Contractor of the investment

The F.B.I. TASBUD Capital Group has become the General Contractor for the Porta Mare complex. The building will consist of seven segments ending with characteristic, sloping roofs – thanks to which it will fit into the historic landscape of the Elbląg Old Town. The total area of ​​the complex is over 11 thousand square meters of usable space for various purposes – office, hotel, and service. The building also includes over one hundred parking spaces located in the underground garage and several dozen above-ground spaces. In addition, the complex will be equipped with numerous electric car charging stations. 

Statement of the Vice President, Dr. Eng. Andrzej M. Czapczuk

After the end of the event on the construction site, the Vice President of the Management Board and General Director of F.B.I. TASBUD S.A. said:

Today we took part in the ceremonial commencement of the construction of the Porta Mare office building. This building is one of the elements of the development of this region. I’m sure it will contribute to the growth of its importance for domestic and foreign investors. At the same time, the impact of this investment on the opportunities created by the Shipping Channel through the Vistula Spit, which has just been put into operation, is not without significance. Together with Operator ARP, we decided to use environmentally friendly elements created in the pro-ecological factory of modules and prefabricates of the F.B.I TASBUD Capital Group in the construction of the office building. They will not only contribute to shortening the time of work on the construction site but also confirm the modern character of the building, despite its classic shape.