We invite you to the Miasteczko Greenwood construction site at Verdiego Street in Warsaw. We present photos seen from an unusual aerial perspective. Intensive construction works are underway at the next, already fourth stage of the investment.

F.B.I. TASBUD International Group, as the General Contractor, is currently carrying out construction works related to the construction of the foundation slab, underground floors are being built with garages for future residents.
The works are carried out at the highest level and using the latest technologies. The investment substrate is reinforced with the DSM (Deep Soil Mixing) column technology, which guarantees the efficiency and economy of this process.

The investment is located in the green part of Warsaw, in the Białołęka district. In the background of the implemented stage of the investment, which will consist of nearly 200 apartments, you can see the buildings of the estate that have already been built by our Group.

Bright, white and gray facades and spacious loggias and balconies guarantee the housing estate a modern look that attracts new residents. Good location of the buildings and panoramic windows make the apartments very sunny. There are also numerous service premises located on the estate, which will ensure comfort and convenience for current and future residents.